Cleanout Following Avalanche - September 2023
Once the snow melted we discovered prospect creek was completely blocked up high, by our east well heads, with boulders, trees, snags, rocks, and dirt. If the debris were not cleared Prospect Creek would likely have cut an entirely new path down through the Prospect Drive and Canyon Drive neighborhood.
Prospect Creek - September 2023
Truck included in photos to show scale and extent of cleanout.
September 2023
The boulders in front of truck were removed from Prospect Creek. They were rolled about 150 feet from the creek to the location shown.
Equipment
This large excavator had been rented by SB County for a different cleanout project. After SB County was finished with it we contacted the rental company and rented it for a few days before it was taken away.
2026 Problem
Since the 2023 cleanout, a few boulders have fallen in from the sides and present a new blockage risk.
One straight-forward solution is to use a large excavator to roll them down to the dirt road, then to the west, placing them next to the other boulders that were remove in 2023.